Zilber Property Group
Construction Project PortalIndustrial Development
← Zilber Industrial 4 (C251) portal
Caledonia Corporate Park · I-94 Corridor · Southeast Wisconsin

Caledonia Corporate Park — Site Information

Park-level records for the original 93-acre Badger Farm land: surveys & CSMs, easements, business-park infrastructure, and land due diligence. Building portals (C251 and future buildings) all reference this page.

All Lots — stitched from the recorded CSMs

One drawing assembled from CSM 3679 (Lots 6–7 + Outlots, base) with Lot 4 merged in from recorded CSM 3601 and Lots 1 & 2, Outlot 1, and Carly Avenue merged in from recorded CSM 3552 (sheet 3), all at matched scale. Hover any lot or easement label and click — it opens the governing document.
Caledonia Corporate Park — all lots, stitched from recorded CSMs

Survey Information — in order

PDF
1. ALTA Survey (1912.00)
Original 92.79-acre Badger Farm survey at purchase
PDF
2. CSM No. 3552
Recorded 5/4/2023 · Doc 2653548 · first subdivision of the farm — Lots 1 & 2, stormwater pond outlots, road dedication
PDF
3. Post-Construction As-Built — w/ Gas & Electric Utilities
2/2024 · utility locations around Lots 1 & 2 · marked not final
PDF
4. CSM No. 3601
Recorded 5/29/2024 · Doc 2677634 · resubdivided Lot 3 of CSM 3552 (Saputo parcel split)
PDF
5. CSM No. 3679
2026 · all of Lot 5 of CSM 3601 → Lot 6 = the C251 site · easement labels on the map are clickable

Easements

Each entry is the complete document — agreement with its exhibit(s) attached.
PDF
Storm Sewer & Drainage Easement Agreement
TRI signed · incl. Exhibits B1 (North) & B2 (Baxter Ct) · pending Utility District approval & recording
PDF
Sanitary Sewer Easement Agreement
TRI signed · incl. Exhibit B (Carol Rd / sampling manhole) · pending approval & recording
PDF
Stormwater Pond Easement Agreement
RECORDED Doc 2671168 · 2/14/2024 · Outlots · incl. exhibits
PDF
Sanitary Sewer Easement — Southern (Lot 4)
RECORDED Doc 2694005 · 1/30/2025 · Village Sewer Utility District · incl. Exhibit A
PDF
Access & Cross-Access Declaration (Lots 1 & 2)
RECORDED Doc 2659644 · 8/4/2023 · incl. Exhibit A
PDF
WE Energies Easement — Lot 4 (CSM 3601)
Gas & electric · WR 5003810 · grant + Exhibit A · per WE Energies 1/14/2025
PDF
WE Energies Easement — Lot 2 (CSM 3552)
Gas & electric · WR 4991945 · grant + Exhibit A · per WE Energies 1/14/2025
Also cited on CSM 3679: 20'×55' storm sewer easement as Doc 2720817 (recorded copy not yet in the project files).

Business Park Drawings

Public Infrastructure — REV 7 construction set (5/1/2023, closeout record copy), split for viewing:
PDF
Pt 1 — Roadway Plans & Profiles
Carol Rd, NE Frontage, access roads, erosion control
PDF
Pt 2 — Mass Grading & Profiles
Original grading work
PDF
Pt 3 — Details, Traffic & Intersections
Standard details, signage, traffic control
PDF
Pt 4 — Landscape
L-sheets
PDF
Park Concept — v48 Overall
5/14/26 · actual buildings only
If there is a marked-up as-built set (roads / grading / NE intersection) beyond this record copy, point me to it and I'll swap these.

Due Diligence

PDF
Geotechnical Report — Badger Farm
42 borings across the 93-acre parcel
PDF
Phase I ESA — Executive Summary
92.79-acre property · PSI · full 242 MB report in project files
PDF
DNR Wetland Exemption Decision
Nonfederal urban wetland exemption · EXE-SE-2022-52-02445
Wetlands delineated by Heartland Ecological Group, October 2020 (per CSM notes). Construction-phase soils by Reesman's completed 6/16/26.

Land Acquisition

Caledonia Corporate Park is the original 93-acre Badger Farm purchase (project CM5202), master-planned into industrial lots off I-94 at CTH "K" / Northwestern Avenue. Subdivision happened over time — CSM 3552 (2023), CSM 3601 (2024), CSM 3679 (2026) — with public roads dedicated and park infrastructure built in 2023–24. The C251 building sits on Lot 6 of CSM 3679. Due-diligence source files live in the CM5202 project folder.